A school operator needs to connect a room complaint with the building, floor and equipment behind it. ATRIUM brings those views into a coordinated Niagara interface, while keeping the investigation grounded in the available source data.
Consider a school estate with three buildings and a complaint about a warm classroom. The building overview shows 24 active alarms and an alarm record for VAV-215 with a zone temperature of 80.1°F. The useful next step is to establish the location, time and source coverage before drawing an equipment conclusion.
Buildings in scope
3
Active alarms
24
VAV-215 zone reading
80.1°F
Scenario snapshot. Figures describe the scenario setup. Live readings and available actions depend on the project's configured sources.
01 Start with the building summary and its source coverage.02 Use the building and floor context to narrow the investigation.
01 / OPERATOR WORKFLOW
Establish the building context
Start at Dashboard. Confirm which building is selected and read source-coverage and status messages alongside the headline alarm count. A complete alarm source and a partial building snapshot describe different things.
02 / OPERATOR WORKFLOW
Locate the room and equipment
Use System View to select the relevant building and floor. Follow the equipment relationship into the affected area and compare nearby conditions. A plan marker identifies location; it does not establish the cause of a comfort issue.
03 / OPERATOR WORKFLOW
Check the recorded evidence
Open the relevant alarm record and use configured Charts or History resources to check the same source and time interval. Record any missing or stale data rather than treating a blank as a normal value.
04 / OPERATOR WORKFLOW
Prepare the operator handoff
Write down the building, floor, equipment, reading, units, event time and next verification. Use the configured schedules or report resources when they help explain the operating context.
What this workflow helps establish
The investigation can end with a location-specific evidence record and a defined next verification, rather than an unsupported diagnosis from the school-wide summary.
Reporting & recorded context
Dedicated Reports, Charts and History pages provide routes to configured resources and records. Available report results, scheduling and editing depend on the project's Niagara services and permissions.
What the project supplies
Building, floor and equipment relationships with the school's own plans.
Mapped points, histories and alarm records for the intended scope.
Configured report, schedule, directory or remote-connection resources where those pages are used.
The correct host-bound license, signed modules, certificates and operator permissions.